EngineersGarage

  • Engineers Garage Main Site
  • Visit our active EE Forums
    • EDABoard.com
    • Electro-Tech-Online
  • Projects & Tutorials
    • Circuits
    • Electronic Projects
    • Tutorials
    • Components
  • Digi-Key Store
    • Cables, Wires
    • Connectors, Interconnect
    • Discrete
    • Electromechanical
    • Embedded Computers
    • Enclosures, Hardware, Office
    • Integrated Circuits (ICs)
    • Isolators
    • LED/Optoelectronics
    • Passive
    • Power, Circuit Protection
    • Programmers
    • RF, Wireless
    • Semiconductors
    • Sensors, Transducers
    • Test Products
    • Tools
  • Advertise
You are here: Home / Replies / if you want to perform

if you want to perform

|

Electronics › Electronics › arm7lpc2148 › if you want to perform

June 17, 2015 at 7:16 am #12993
Ashutosh Bhatt
Participant

if you want to perform simulteneous operation then you need timers and interrupts.

although it will not be simulteneous but due to high frequency switching between both tasks it seems to be like simulteneous operation

RSS Recent Posts

Stay Up To Date

Newsletter Signup
EngineersGarage

Copyright © 2026 Arrowfly LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Arrowfly
Privacy Policy | Advertising

Search Engineers Garage

  • Engineers Garage Main Site
  • Visit our active EE Forums
    • EDABoard.com
    • Electro-Tech-Online
  • Projects & Tutorials
    • Circuits
    • Electronic Projects
    • Tutorials
    • Components
  • Digi-Key Store
    • Cables, Wires
    • Connectors, Interconnect
    • Discrete
    • Electromechanical
    • Embedded Computers
    • Enclosures, Hardware, Office
    • Integrated Circuits (ICs)
    • Isolators
    • LED/Optoelectronics
    • Passive
    • Power, Circuit Protection
    • Programmers
    • RF, Wireless
    • Semiconductors
    • Sensors, Transducers
    • Test Products
    • Tools
  • Advertise